1- Block 438 B development - Company CNPC Algeria

-   FDP surface facilities development philosophies
-   FEED scope of work :

This scope of work concerns in general

The total surface facilities description and preliminary process simulation to fix the main parameters necessary to understand the development philosophy:

-   CPF design to 20 000 bopd (oil separation, oil stabilization, desalting, wet gas dehydratation using T.E.G dehydrator for 500 000 m3/day)
-   FPF for 10 000 bopd and gas recovery
-   Gathering system for 20 wells (hydraulic study)
-   Gas lift system (network and compressors calculation)
-   Injection water system configuration
-   Wet gas export system (hydraulic study and compressor system definition)

Support to procurement department for the ITB documents

Contract FEED awarded to CH2MHILL Abu Dhabi

Contact Us

   Home: Cité du 20 Août Villa 44 BOUMERDES, CP: 35000. ALGERIA
   Phone Number: +213-553-394-856
  e-mail: consulting@upstream-consult.com

Follow us