1- Rhourde Erouni RER – company KOUGP Algeria


MEM blocks bid round
General topics:

1- Development philosophy:

Two options are studied:

 

Option1: using the existing facilities of SONATRACH/ELBORMA

Option 2: standalone

2-Deliverables:

2-1 Gathering system:

- Hydraulic study
- Flow lines sizing
- Trunk lines sizing

2-2 Oil treatment plant:

- CPF (Elborma):

Tie-in points location
Remaining capacity evaluation
Revamping scenarios

- CPF (standalone):

Process simulation
Export system study (export pipeline and tie-in with Sonatrach pipeline ELB-HMD)

Gas line: CPF-ELB

2-3 Reports:

- Process description
- Pfd for the different systems
- Hydraulic study
- Equipments list
- CAPEX

Contact Us

   Home: Cité du 20 Août Villa 44 BOUMERDES, CP: 35000. ALGERIA
   Phone Number: +213-553-394-856
  e-mail: consulting@upstream-consult.com

Follow us